Recovery line

Thursday, September 3 · Shift B · 14:32 local

Facility online
Available pool148 legs+12 released this shift
On recovery line117 zones active
Charged packs32 sets8 below ready shelf
Open exceptions62 require immediate action

Physical recovery line

Serial flow from incoming return to production-ready availability.

● Updating from local ledger
2 received02Check-in4 min avg.
1 awaiting review01Inspection1 failed today
2 in cycle02Cleaning8 min avg.
3 at station03Battery swap32 ready sets
1 diagnostic hold01Diagnostics1 fault raised
2 queued02Controller check-in6 min avg.
148 available148Ready poolLine start
FlowingAttentionDivert / hold

Exception queue / 6 open

Leg / assetConditionCurrent locationAge
LG-4028Diagnostics fault
Drive-axis encoder mismatch
Diagnostics bay18 minReview
LG-3981Inspection failed
Wheel-caster wear above limit
Inspection divert42 minReview
LG-4176Battery-set gap
56V pack not assigned
Swap station9 minAssign
LG-3650Return threshold
Local overdue; reconciliation pending
Deployed14hTrace